
Madrid Sports Club
A flagship multi-court indoor padel facility for one of Madrid's premier sports clubs — designed for elite play and premium member experience.
Client
Madrid Sports Club
Location
Madrid, Spain
Year
2025
Court Type
Panoramic Indoor
Number of Courts
6
Surface
Premium Blue Artificial Turf
Lighting
LED Competition Standard
Installation Time
4 Days Per Court
Manufacturing
European Certified Facility
Branding
Full Club Identity Integration





The Challenge & Solution
Madrid Sports Club needed to expand their facilities with 6 high-quality padel courts while maintaining operations throughout the construction period. The challenge was delivering premium courts within a tight 90-day window ahead of the new season.
Global Padel Operations conducted a thorough site evaluation and proposed a phased installation approach — courts were installed in groups of two, allowing the club to operate partially throughout the process.
The result: all 6 panoramic courts delivered on schedule, fully branded, and immediately ready for elite competition. The club reported a 340% increase in padel membership enquiries within the first month of opening.
"The quality exceeded our expectations. Our members were playing on world-class courts within days of completion."
— Diego Herrero, Club Director, Madrid Sports Club
Panoramic Glass Structure
Full panoramic glass walls on all sides provide maximum visibility for spectators and create a premium playing atmosphere.
Competition LED Lighting
Custom LED lighting system engineered for uniform illumination across all 6 courts, meeting international competition standards.
Premium Blue Turf Surface
Club-grade artificial turf in club signature blue, selected for optimal ball bounce, player comfort, and durability.
Full Club Branding
Custom court graphics, signage, and branded elements throughout the facility reinforcing the Madrid Sports Club identity.
Player Amenities Package
Complete accessories package including premium benches, electronic scoreboards, ball dispensers, and referee chairs.
4-Day Installation
All 6 courts completed in 24 days total — our professional installation crew delivered on schedule with zero disruption to existing club operations.
Related Projects
Marbella Beach Resort

London Padel Centre

Dubai Sports City
Ready to start your own padel project?
Request a Consultation